Ideas catalog (docs/ideas/): 25 feature concept documents covering future
lore capabilities including bottleneck detection, churn analysis, expert
scoring, collaboration patterns, milestone risk, knowledge silos, and more.
Each doc includes motivation, implementation sketch, data requirements, and
dependencies on existing infrastructure. README.md provides an overview and
SYSTEM-PROPOSAL.md presents the unified analytics vision.

Plans (plans/): Time-decay expert scoring design with four rounds of review
feedback exploring decay functions, scoring algebra, and integration points
with the existing who-expert pipeline.

Issue doc (docs/issues/001): Documents the timeline pipeline bug where
EntityRef was missing project context, causing ambiguous cross-project
references during the EXPAND stage.

Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
2026-02-09 10:16:48 -05:00

82 lines
2.6 KiB
Markdown

# Milestone Risk Report
- **Command:** `lore milestone-risk [title]`
- **Confidence:** 78%
- **Tier:** 3
- **Status:** proposed
- **Effort:** medium — milestone + issue aggregation with scope change detection
## What
For each active milestone (or a specific one): show total issues, % closed, issues
added after milestone creation (scope creep), issues with no assignee, issues with
overdue due_date. Flag milestones where completion rate is below expected trajectory.
## Why
Milestone health is usually assessed by gut feel. This provides objective signals
from data already ingested. Project managers can spot risks early.
## Data Required
All exists today:
- `milestones` (title, state, due_date)
- `issues` (milestone_id, state, created_at, due_date, assignee)
- `issue_assignees` (for unassigned detection)
## Implementation Sketch
```sql
SELECT
m.title,
m.state,
m.due_date,
COUNT(*) as total_issues,
SUM(CASE WHEN i.state = 'closed' THEN 1 ELSE 0 END) as closed,
SUM(CASE WHEN i.state = 'opened' THEN 1 ELSE 0 END) as open,
SUM(CASE WHEN i.created_at > m.created_at THEN 1 ELSE 0 END) as scope_creep,
SUM(CASE WHEN ia.username IS NULL AND i.state = 'opened' THEN 1 ELSE 0 END) as unassigned,
SUM(CASE WHEN i.due_date < DATE('now') AND i.state = 'opened' THEN 1 ELSE 0 END) as overdue
FROM milestones m
JOIN issues i ON i.milestone_id = m.id
LEFT JOIN issue_assignees ia ON ia.issue_id = i.id
WHERE m.state = 'active'
GROUP BY m.id;
```
Note: `created_at` comparison for scope creep is approximate — GitLab doesn't
expose when an issue was added to a milestone via its milestone_events.
Actually we DO have `resource_milestone_events` — use those for precise scope change
detection.
## Human Output
```
Milestone Risk Report
v2.0 (due Feb 15, 2025)
Progress: 14/20 closed (70%)
Scope: +3 issues added after milestone start
Risks: 2 issues overdue, 1 issue unassigned
Status: ON TRACK (70% complete, 60% time elapsed)
v2.1 (due Mar 30, 2025)
Progress: 2/15 closed (13%)
Scope: +8 issues added after milestone start
Risks: 5 issues unassigned
Status: AT RISK (13% complete, scope still growing)
```
## Downsides
- Milestone semantics vary wildly between teams
- "Scope creep" detection is noisy if teams batch-add issues to milestones
- due_date comparison assumes consistent timezone handling
## Extensions
- `lore milestone-risk --history` — show scope changes over time
- Velocity estimation: at current closure rate, will the milestone finish on time?
- Combine with label-flow for "how fast are milestone issues moving through workflow"